Browse By
Carpenter: Second Period: Ceiling Framing Calculations (020205e) Alberta Module

Carpenter: Second Period: Ceiling Framing Calculations (020205e) Alberta Module

Ceiling joists are required to support ceiling finishes when roof trusses are not used or when the ceiling finish is attached to the underside of rafters. These joists are laid out and framed in a similar manner to floor joists; the main difference being that additional joists are not required at the partition locations. Backing is nailed to the top of the cap plate of the partition running parallel to the ceiling joists to provide support for the ceiling finish.

The product can only be shipped to addresses in British Columbia

Print on Demand means the publication is printed by Crown Publications only when an order has been received. This publication is not stocked in the warehouse.

Stock:
Available (Print-On-Demand, non-returnable)
Price:
$4.59 Each
Author:
NAIT/SAIT
Number of Pages:
36
Publish Date:
July 11, 2019
Product No.:
7850002113
Format:
Soft Cover - Saddle Stitch
This item is found in:
Quantity:
Belongs in Packages
Sort: Product # Sort: Product Name
See return policy for Print-On-Demand items.